Barakah Nuclear Energy Plant

SCOPE

Supply, Factory Acceptance Test (FAT), Installation Supervision, Site Acceptance & Testing (SAT) and hand over. The project consists of internal AC UPS units and Outdoor AC UPS of different capacities 1kVA, 10kVA, 30kVA, 60kVA, 120kVA and 320kVA respectively at the PPS buildings and perimeter surveillances of the Barakah facility. These UPS systems are designed to provide an uninterrupted power for the security system during the failure of permanent AC power.

BRANDS

UPS - ABB (formerly GE), TSI Power

COMPLETION YEAR

2018

Category
Abu Dhabi, UPS
Tags
FAT, Installation, Site Acceptance & Testing, Supervision, Supply, UPS
About This Project

The Barakah nuclear power plant is the United Arab Emirates’s first nuclear power station, the first nuclear power station in the Arabian Peninsula, and the first commercial nuclear power station in the Arab World.  The Barakah Nuclear Energy Plant is located in the Al Dhafra of the Emirate of Abu Dhabi on the Arabian Gulf, approximately 53 km west-southwest of the city of Ruwais. The Plant’s four APR1400 design nuclear reactors will supply up to 25% of the UAE’s electricity needs once fully operational.